Redwood Invest Report
  • Business
  • Politics
  • Stocks
  • Investing
  • Business
  • Politics
  • Stocks
  • Investing

Redwood Invest Report

Investing

Munda Gold Mine Mining Progresses: First Blast

by admin June 19, 2025
June 19, 2025
Munda Gold Mine Mining Progresses: First Blast

Auric Mining Limited (ASX: AWJ) (Auric or the Company) is pleased to provide an update on mining of the Starter Pit at the Munda Gold Mine, 5km from Widgiemooltha, Western Australia.

Highlights

  • First blast 17 June 2025.
  • Mining is well underway in Starter Pit.
  • Approximately 70,000 BCM mined in first month.
  • Largely free-dig to date.
  • Site preparation for Waste Dump and ROM pads completed.
Management Comment

Managing Director, Mark English, said:

“It’s a momentous time in our progression and development of the Company, we are delighted.

“Mining is in full swing and all activities are progressing as we expected. Nothing is holding us back. We are achieving our targets and are exactly where we expected to be in the mine development.

“We are pleased to be monetising our major asset in such a bullish gold market, the timing is excellent. It is a great place to be as an unhedged gold producer,” said Mr English.

Approximately 70,000 BCM (Bank Cubic Metres) of material have been mined at Munda over the first 4 weeks of operations from a pit design encapsulating 380,000 BCM. Mining to this stage has been largely free-dig with the first blast completed 17 June 2025.

Auric personnel are utilising a dry hire fleet comprising a 125t excavator and four 40t articulated ‘Moxi’ dump trucks together with relevant ancillary equipment.

Both RC grade control and blast hole drilling, together with blast supervision is managed by Kalgoorlie-based Total Drilling Services Pty Ltd.

The Company has estimated that approximately 125,000 tonnes of ore will be extracted from the Starter Pit at a grade of 1.8g/t Au1. Most of that ore will be mined toward the base of the Starter Pit, during the last two months of operations. The Starter Pit is scheduled for completion in October.

Munda has an estimated resource of 145,000 ounces of gold at a 0.5g/t cut-off2. Once the Starter Pit is finished Auric expects to complete detailed planning for a larger pit, to commence in 2026.

The Company is fully funded to mine the Starter Pit at Munda from the proceeds of gold sales from the Jeffreys Find Gold Mine near Norseman.

Click here for the full ASX Release

This post appeared first on investingnews.com

previous post
Brunswick Exploration
next post
Nifty Copper Project Virtual Site Visit

Related Posts

FPX Nickel Receives Multi-Year Area-BasedPermit and Commences 2025...

July 8, 2025

Locksley Resources LimitedLt. Gen.Schwartz to Advance US Defense...

December 15, 2025

Top 5 Canadian Oil and Gas Dividend Stocks...

January 21, 2026

Charbone Hydrogene annonce les resultats financiers T2 2025

August 30, 2025

Australia Awards Major Project Status to Donald Rare...

October 22, 2025

Questcorp Mining to Present at the Emerging Growth...

September 23, 2025

Tech 5: NVIDIA Hits Market Cap Milestone, Harmonic...

July 14, 2025

Copper Quest Closes $1,927,000 Private Placement

December 6, 2025

Silver Price Surges Above US$44 Following Fed Rate...

September 23, 2025

Tech Weekly: Micron Rises on Latest Results, Trump...

December 21, 2025

    Sign up for our newsletter to receive the latest insights, updates, and exclusive content straight to your inbox! Whether it's industry news, expert advice, or inspiring stories, we bring you valuable information that you won't find anywhere else. Stay connected with us!


    By opting in you agree to receive emails from us and our affiliates. Your information is secure and your privacy is protected.

    Recent

    • CHARBONE presentera a la conference Hydrogen East et annonce le developpement d’un hub d’approvisionnement dans le marche de l’Atlantique via sa filiale

    • Tartisan Nickel Corp. Intersects 24.6 Metres of 0.71% Ni, 0.56% Cu Including 6.1 Metres of 1.17% Ni, 1.45% Cu at the Kenbridge Nickel-Copper-Cobalt Project, Northwestern Ontario

    • LaFleur Minerals Inc.Taking Key Steps to Advance Position in Prolific Gold Belt

    • NevGold Mobilizes Drill To Test Historical Leach Pads To Advance The Near-Term Antimony Production Scenario at Limo Butte

    • Cartier Cuts 7.1 g/t Au over 8.0 m at Portal ; New Shallow High-Grade Gold Zone Discovered

    • 171 million travelers face airport delays as Democrats’ DHS shutdown hits TSA staffing, Scalise warns

    Categories

    • Business (214)
    • Investing (1,909)
    • Politics (2,292)
    • Stocks (119)
    • About us
    • Contact us
    • Privacy Policy
    • Terms & Conditions

    Copyright © 2025 redwoodinvestreport.com | All Rights Reserved